Flat sun-baked backyard with patchy grass, chain-link fence, and concrete slab patio — before pool installation
BEFORE
Finished freeform gunite pool with integrated spa, flagstone coping, and still water reflecting the sky — after pool installation
AFTER

We carve
water into
backyards.

From limestone and clay to rebar cages, plumb return lines, and gunite — until a hole in the ground becomes the centerpiece of your life at home.

drag to reveal
Gunite Construction·Rebar & Steel·Freeform & Geometric·Spa Integration·Flagstone Coping·Austin · Round Rock · Dripping Springs·Licensed & Insured·25-Year Structural Warranty·Gunite Construction·Rebar & Steel·Freeform & Geometric·Spa Integration·Flagstone Coping·Austin · Round Rock · Dripping Springs·Licensed & Insured·25-Year Structural Warranty·

What's beneath
the water.

Every pool we build starts as an engineering problem. Six distinct layers, each specified to code, each inspected before the next begins.

0"↗ detail

Finished Coping & Deck

Flagstone or travertine coping. Concrete or paver deck. Expansion joints every 8 ft.

SPEC: 2" flagstone · 1/2" mortar bed · expansion joint @ 8'

−8"↗ detail

Bond Beam & Steel Cage

#4 rebar at 12" on center each way. Bond beam ties pool shell to deck structure.

SPEC: #4 rebar @ 12" O.C. E.W. · 3" min cover · ACI 318 compliant

−14"↗ detail

Gunite Shell

6" minimum shotcrete shell. 5000 PSI mix design. Shot in a single continuous pass.

SPEC: 6" min shell · 5000 PSI · w/c ratio ≤ 0.45 · ACI 506

−24"↗ detail

Return Lines & Main Drain

2" Schedule 40 PVC return lines. Anti-entrapment main drain assembly. Pressure-tested to 40 PSI.

SPEC: 2" SCH 40 PVC · VGB-compliant drain · 40 PSI pressure test

−36"↗ detail

Compacted Gravel Base

#57 crushed stone, 6" min depth. Provides drainage relief and uniform bearing pressure.

SPEC: #57 stone · 6" min · 95% Proctor compaction

−48"↗ detail

Native Soil / Limestone

Excavated to bearing stratum. Soil report required. Compacted clay or limestone bedrock.

SPEC: Bearing capacity ≥ 1500 psf · geotech report on file

The dig,
documented.

Every excavation is photographed from the air and compared against the engineering plan. Geometry is non-negotiable.

Aerial drone view of active pool excavation showing red earth walls, rebar cage placement, and survey stakes marking corners
SURVEY STAKE A1
REBAR CAGE
DRONE PHOTO · EXCAVATION DAY 4
PROPERTY LINERESIDENCESPATAN LEDGE28'-0" OVERALL WIDTH18'-0" LENGTHEQUIPPADN10'-0"
28 × 18ft

Pool Footprint

3,200gal

Spa Volume

14days

Excavation to Gunite

Design
your pool.

Tell us what you're building. We'll follow up within one business day with a preliminary site assessment and budget range.

01 / Yard Dimensions

02 / Pool Shape

03 / Must-Have Features

04 / Estimated Budget

05 / Contact Information

No commitment required · Site assessment scheduled within 5 business days

Download Our Build Process Guide

24 pages covering excavation, steel, plumbing, gunite, and finish selection. Written for homeowners, not contractors.

340+

Pools Built in Texas

18 yr

In Operation

100%

Gunite Construction

25 yr

Structural Warranty